Saturday, June 7, 2008

Assess This!

Finally, exactly four months past the original date to start demolition/construction, our builder was finally able to pick up the building permits last Tuesday and things have been moving along smartly ever since. In order to support a second floor, about ten large openings have been made in the concrete slab at key points to make pads to support the additional structure. Our contractor, RVM Construction, plans to be pouring concrete this coming Wednesday. After that, the roof will come off, the walls will be stripped to the studs, or replaced entirely in rebuilding process.

Several readers have noted the lack of updates to The Movie: Demolition after its original posting. Frankly, for the past few months there was nothing to add. In the meantime, I've reconsidered the method of presentation, and decided to replace it with The Slide Show: Demolition a Flash slide show with much better resolution. This will be easier to update as well. As the project proceeds, I'll post slide shows on the framing, stuccoing, window washing, etc.

The other day, I received a joke email about property taxes. The most noteworthy aspect for me was the remarkable resemblance of the fourth image (as seen by your appraiser) to the current condition of our house.



No comments: